|
Over
the past nine years our staff has dealt with a wide variety of logistical
challenges posed by LGSF delivery. The idea of 'prefabricated walls' arriving
at the site 'ready to install' sounds easy,
but there are hidden pitfalls that may be created if the wrong combination
of 'delivery systems' is used. MG can ease this problem by helping the
general contractor arrange for either KD cut packs, prefabricated walls
built in a factory, job-site assembly of walls, or 'just in time' wall
assembly (using cut packs) right on the slab.
|
|