Metallbau can show your building team how our unique combination of consulting,
value engineering, and specialized drawing methods can reduce the hidden
costs that creep into most projects and affect the cost of non-steel items.
1. Hidden Cost Savings: The savings gained by using MG's value engineering
"VE50+" system can usually exceed the total amount of the
entire Metallbau consulting fee.
2. Scope of work: MG can assist A&E and general contractors
with preparation of a comprehensive scope of work document-one that
is specifically designed for LGSF projects. 'Off the shelf' LGSF specifications
may omit many of the key details that we've found necessary for building
real world LGSF projects. MG can also point out potential problems with
the scope of work-especially where careful attention is often needed
to define a clean interface between the LGSF subcontractor and other
subcontractors.
3. Structural engineering: MG saves money for your engineering
design team. Extra, unnecessary costs tend to creep into the design
of steel framing, not only in the cost of the4. steel materials, but
in the cost of performing the structural engineering design. MG can
show the A&E team how they can save money for themselves, and the
building's owner, by preparing plans in a manner that will reduce the
number and cost of expensive requests for information. This will save
the entire construction team the cost of shipping, extra printing, revised
details from the structural engineer, bulletins prepared by the architect,
confusion on the job site, lost instructions, tear-out of previously
completed work, and many other negative impacts of imprecise or incomplete
bid documents.
5. Wall, Floor, and Roof Assemblies: MG brings extensive experience
gained by building a wide variety of assemblies.
6. Connections and detailing: MG maintains a library of hundreds
of proven details that we have personally built under field conditions.
MG can show your design team which details work best in real world construction
situations, but we must do so before the engineering details have been
completed.
7. Fabrication: MG can identify which cutting tolerances work best
under various fabrication conditions. Our specialized software includes
design criteria for real-world wall panels that are not available in
off-the-shelf commercial software.
8. Labor Availability: MG can save money for your fabricators and
assemblers by showing them how to use special techniques to accelerate
the production of wall panels and trusses.
9. Site Logistics: MG can save money for all subcontractors by
improving site logistics. MG has experimented with many different logistics
approaches and can suggest the best combination of material delivery,
storage, on-site assembly methods, and installation procedures. Special
attention must be paid to access to lifting capability, where problems
typically appear later in a project when many subcontractors are all
vying for the same lifting resources.
10. Delivery Methods: MG saves money for the building owner and
general contractor. A building's site location relative to the closest
qualified component manufacturer will affect the cost of delivering
LGSF components. MG can design the right mix of 'knock-down' or panelized
components that will provide the owner with the lowest overall price.
On multi-story buildings the GC saves money by minimizing logistics
problems and maximizing crane time availability-a continuing challenge
on most multi-story projects.
 
|
|